Construction Site Broadband – What are the Options? Strengths and Weaknesses of potential technologies…

Construction Site Broadband – What are the Options? Strengths and Weaknesses of potential technologies…
What are my options for getting Broadband at a new / temporary site? The pros and cons of available technologies Fixed line – ADSL – leadtime weeks, speed slow (<10Mbit), cost low but getting more difficult to procure as we approach the switching off of the copper network in 2026. Fixed line – FTTC – leadtime weeks / months. Not universally available. Speed slow (10s of Mbits). Cost low. Fixed line – FTTP / Leased Line – leadtime months. Speed

Digital Construction Week, National Digital Twin, ARUP Decarbonises, £624m for Housing

Digital Construction Week, National Digital Twin, ARUP Decarbonises, £624m for Housing
Digital Construction Week 2021 Now Live Digital Construction Week is 24-25 at ExCel London and has announced its speaker lineup. DCW is Europe’s leading innovation and technology event for the built environment. In partnership with UK BIM Alliance the Show will host a BIM village with BIM workshops, CPD learning hours qualified presentations. Register free. Geo Business, the Geospatial technology show, is running next door for anyone involved in the gathe

Ground-breaking internet access, speeds & security for Whitehill & Bordon

Ground-breaking internet access, speeds & security for Whitehill & Bordon
Addressing connectivity in the town of the future Whitehill and Bordon Regeneration Company (WBRC) deployed a private 4G Long Term Evolution (LTE) mobile network in its development of the new town centre which delivers reliable and secure connectivity providing groundbreaking uplink and download internet speeds. To deliver on its ‘digital’ vision WBRC invested in its own dedicated private fixed and wireless networks. WBRC’s vision was a hybrid network wit...